Operation New Bathroom Part III- Almost Complete!

23 Feb

The bathroom is now 100% functional and about 90% complete- yahoo!

In the past week, it has gone from this.

IMG_2505

To this.

IMG_2516

Ben painted and patched the ceiling and added crown molding…

IMG_2526

Installed the base boards….IMG_2534Installed the vanity and mirror (both from Home Depot/Home Decorators)…IMG_2546

Installed the sconces (from Lowe’s). We used Edison style light bulbs from Home Depot. Aren’t they so cool?

IMG_2537Installed the oil rubbed bronze sink and shower fixtures (all Delta)…

IMG_2540

IMG_2524And hung the curved shower rod and shower curtain (from Kohls)…

IMG_2523As you can see it’s pretty much complete. Here’s what’s left on the agenda before we can put a fork in it:

  • Install a new window and window casing (coming Tuesday)
  • Switch out door hardware
  • Build vintage-looking ladder to hold towels
  • Decorate walls and open shelving on vanity
  • Install toilet paper holder and towel bar
  • Hang window shade

Very exciting! Now off to go bowling with some friends in the city. Hope everyone is having a great weekend!